Tocci Stock Image

Check out this video that our design team recently put together showing the prefabrication and modular process at Park87, our modular project in Cambridge, MA. Over the course of five days, 76 units were delivered and installed; each one was already wired and had all the HVAC installed. The building went up right before our eyes!

Park87 Modular Construction from Hairlosstreament on Vimeo.

For more information on

Read More [+]


  • 0
  • 0
  • 0
Tocci Stock Image

One of Tocci’s current projects, Park87, is a traditional GMP contract, where Tocci is responsible for construction management. However, the demands of the project required that our team extend our scope, without contract modification. We became intimately involved in the design and detailing process, supporting and executing design documentation, permit drawings and shop drawings – all facilitated through the Tocci-authored Building Information Model (BIM).

Although Tocci was able to leverage the architectural design…

Read More [+]


  • 0
  • 0
  • 0
Tocci Stock Image

One of the unique features at Park87 (Tocci’s modular residential project in down town Cambridge, MA) is the flexibility of individual unit layouts, facilitated by what the team has dubbed “flex walls.”

Flexible layouts were an early goal for the owner; these walls had to be designed and executed so that residents could re-arrange certain walls almost as easily as they would re-arrange furniture. Although the final detail doesn’t allow for daily adjustment of wall…

Read More [+]


  • 0
  • 0
  • 0
Tocci Stock Image

The first IPD project in New England: Autodesk’s AEC Headquarters, which Tocci built last year along with KlingStubbins and Autodesk, Inc. has received yet another accolade. The International Interior Design Association awarded it “Best Office” (in the 30,000+ sf category) at the June 22, 2010 awards ceremony at the Boston Museum of Fine Arts.

Click here for more details.


  • 0
  • 0
  • 0
Tocci Stock Image

This month’s TocciToday is out, here is the intro to pique your interest!

Buildings – like cars and people – require maintenance and the occasional surgery to live long, productive lives. At a time when we are all looking at preventive care or restoration or repair, and considering that 90% of the a building’s cost occurs during operation, we thought we would take this month to provide you with solutions for extending the…

Read More [+]


  • 0
  • 0
  • 0

Авана 100

форд куга цена

https://pillsbank.net