New Here? We’ve got you covered.

Tocci is all about improving the process of working together. Good teamwork requires clear communication, so we've highlighted some important links for our major stakeholders.
  • Owners
  • Designers
  • Trade Partners
  • Careers
 

Virtual Design + Construction (VDC)

Trained in both architectural design and various construction technologies, Tocci’s VDC Group is versatile.

Many building owners opt to engage Tocci’s VDC group early in pre-construction to assist the A/E team with MEP and structural coordination, and to ensure that the bid documents are as detailed as possible. When requested, our group can also cost-effectively build a virtual model of the project. This is especially important when the A/E team…

Read More [+]



Our two-building residential development in Charlestown continues to make progress throughout the winter months. The first building is a 100-year-old, former print manufacturing facility that will be re-adapted into 45 new residential apartments. The second building onsite was a one-story printing warehouse, which is to be replaced by a four-story modular residential apartment building with a structural steel podium slab on deck with open parking below. We spoke with Field Engineer, Brian Wyer, to get…

Read More [+]



Like love and happiness, the desire for respect is a common human quest. We all want to be respected. Respect was the topic of Tocci’s first 2018 company-wide workshop.

On a high level, the attitude level, we are a very respectful group.

Respect is a feeling of admiration for someone elicited by their abilities, qualities, or achievements.

At Tocci we are big on subject matter experts. We know who is best at spreadsheets,…

Read More [+]



Our occupied renovation in South Boston is making great progress. To find out more about this two-story, 150,000 sf building, we spoke with Superintendent, Tim Corbett:

At 645 Summer Street, we are moving along as the weather permits with the shotcrete process on the exterior shear walls. This involves installing a vertical rebar mat that is attached to angles that are welded to the building’s structure, then covering the area with shotcrete. Shotcrete is…

Read More [+]



Our South End mixed-use project is continuing to make progress as we carry on construction through the cold winter months. To get us up to speed, we spoke to Area Superintendent, John Adams:

The structural slab was placed last week at 88 Wareham Street, and we are currently setting up the gang forms for the basement foundation walls. A smaller 15 ton crane was brought on site and placed on the basement slab to…

Read More [+]